Production Management:
Production techniques: Huafa possesses the whole process through raw material mixing and prilling to the delivery of finished products, which has ensured the product quality and delivery time.
Production process: Material mixing- prilling- extruding- cutting- glass insulating- assembling- inspection- packaging- delivery
Production capacity:
Huafa boasts strong mould development capabilities, and it usually takes less than 7 working days.
The prilling capacity of single shift is 1.5 tons, and the daily production of 4.5 tons;
The daily extrusion of single shift is 144 meters, and the monthly production reaches 75 tons;
The insulating of single shift is 240 square meters, equivalent to 600 pieces (calculated per 0.4 square meters);
Insulating assembling of single shift is 600 pieces;
Assembling of single-layer sliding door is 700 pieces.
Current equipments: 18 extruders, 3 prillers, 1 mixer, 1 double-head cutter, 1 manual cutter, 1 milling machine, 5 drilling mills, 1 spraying production line, 1 insulating gum machine.
|